Skip to content

Ville de Toronto

Entrepreneurs en rénovation à Toronto, Ontario

Toronto Building needs a permit for a deck more than 60 cm (24 in) above the ground, for basement work that changes the structure, adds plumbing or creates a unit, for new or modified heating and plumbing, and for a backwater valve. Replacing a furnace or boiler in a house, or repairing and replacing plumbing fixtures, needs none. If the basement is part of it: Toronto’s Basement Flooding Protection Subsidy pays 80% of the invoice up to $1,600 per backwater valve (two at most), $2,250 for a sump pump, $300 for a battery backup, $400 to sever and cap the foundation drain and $500 for a plumbing assessment — up to $6,650 per house. Downspouts must be disconnected, the contractor needs a City business licence, and you apply within two years. Doyo réserve de rénovation partout à Toronto : décrivez le travail, voyez le prix complet avant de réserver et payez seulement une fois terminé.

Projets

  • Rénovation de cuisinedevis écrit
  • Rénovation de salle de baindevis écrit
  • Finition de sous-soldevis écrit

Chiffré après une visite sur place. Votre acompte est conservé par Doyo jusqu’à ce que vous confirmiez le travail.

Local

Rénovation à Toronto : ce qu’il faut savoir

À propos de Toronto

Permis de construire

Toronto Building needs a permit for a deck more than 60 cm (24 in) above the ground, for basement work that changes the structure, adds plumbing or creates a unit, for new or modified heating and plumbing, and for a backwater valve. Replacing a furnace or boiler in a house, or repairing and replacing plumbing fixtures, needs none.

Source: City of Toronto, when do I need a permit

Condos

In a condo, a renovation generally needs the board’s approval first, and some corporations require approved contractors or limit work hours — check with management before the pro is booked.

Source: Condominium Authority of Ontario, renovations

Subvention contre les inondations de sous-sol

Toronto’s Basement Flooding Protection Subsidy pays 80% of the invoice up to $1,600 per backwater valve (two at most), $2,250 for a sump pump, $300 for a battery backup, $400 to sever and cap the foundation drain and $500 for a plumbing assessment — up to $6,650 per house. Downspouts must be disconnected, the contractor needs a City business licence, and you apply within two years.

Source: City of Toronto, flooding subsidy

Districts patrimoniaux

Toronto has heritage conservation districts across the city. Inside one, new construction, alterations and additions need a heritage permit, which is separate from — and does not replace — a building permit.

Source: City of Toronto, heritage conservation districts

Les quartiers que nous couvrons

Downtown · Midtown · The Annex · Leslieville · Liberty Village · The Beaches · High Park · Etobicoke · Scarborough — et le reste de Toronto.

Comment ça marche

Réserver Rénovation sur Doyo

Tout sur Rénovation

À dire à Doyo

  • La pièce et ce que vous voulez changer
  • Des photos et des mesures approximatives
  • Votre échéancier
  • Une fourchette de budget, si vous en avez une

Qui se présente

A pro who has passed Doyo’s ID and police record checks, with ratings from real jobs. See their profile, reviews and past work before you choose.

Mode de paiement

Un acompte à l’acceptation du devis, conservé par Doyo ; le solde à la fin des travaux ; une partie du paiement du pro est retenue pendant la période de garantie.

FAQ

Rénovation à Toronto : questions fréquentes

Centre d’aide

Sur devis écrit. Un pro se déplace, examine les lieux et envoie un devis détaillé dans l’application. Vous versez un acompte à l’acceptation, et Doyo le conserve jusqu’à ce que vous confirmiez que le travail est terminé. Une partie du paiement du pro est retenue pendant une période de garantie après la fin des travaux : il reste donc de l’argent en jeu si quelque chose doit être repris.