Skip to content

Ville de Toronto

Aménagement paysager, terrasses et clôtures à North York, Ontario

Toronto Building needs a permit for a deck more than 60 cm (24 in) above the ground, for basement work that changes the structure, adds plumbing or creates a unit, for new or modified heating and plumbing, and for a backwater valve. Replacing a furnace or boiler in a house, or repairing and replacing plumbing fixtures, needs none. North York’s Toronto Building district office is at the North York Civic Centre, 5100 Yonge St., by appointment. Toronto’s Private Tree By-law needs a permit to injure or remove a tree 30 cm or more in diameter, measured 1.4 m above the ground; in ravine and natural feature areas any size needs one. Changes to the tree by-laws took effect on September 1, 2026, so check the City’s page before a tree comes down. Doyo réserve d’aménagement paysager partout à North York : décrivez le travail, voyez le prix complet avant de réserver et payez seulement une fois terminé.

Projets

  • Aménagement paysagerdevis écrit
  • Terrasses et patiosdevis écrit
  • Clôturesdevis écrit

Chiffré après une visite sur place. Votre acompte est conservé par Doyo jusqu’à ce que vous confirmiez le travail.

Local

Aménagement et terrasses à North York : ce qu’il faut savoir

À propos de North York

Permis de construire

Toronto Building needs a permit for a deck more than 60 cm (24 in) above the ground, for basement work that changes the structure, adds plumbing or creates a unit, for new or modified heating and plumbing, and for a backwater valve. Replacing a furnace or boiler in a house, or repairing and replacing plumbing fixtures, needs none. North York’s Toronto Building district office is at the North York Civic Centre, 5100 Yonge St., by appointment.

Source: City of Toronto, Toronto Building offices

Arbres

Toronto’s Private Tree By-law needs a permit to injure or remove a tree 30 cm or more in diameter, measured 1.4 m above the ground; in ravine and natural feature areas any size needs one. Changes to the tree by-laws took effect on September 1, 2026, so check the City’s page before a tree comes down.

Source: City of Toronto, when to apply for a tree permit

Districts patrimoniaux

Toronto has heritage conservation districts across the city. Inside one, new construction, alterations and additions need a heritage permit, which is separate from — and does not replace — a building permit.

Source: City of Toronto, heritage conservation districts

Résidus de jardin

Toronto collects yard waste from mid-March to mid-December in kraft paper yard waste bags or rigid open-top containers; bundles up to 1.2 m long and 20 kg, branches up to 7.5 cm across. Grass clippings, sod and soil are not taken.

Source: City of Toronto, yard waste

Les quartiers que nous couvrons

Willowdale · Yonge & Sheppard · Bayview Village · Don Mills · York Mills · Downsview · Lawrence Manor — et le reste de North York.

Comment ça marche

Réserver Aménagement et terrasses sur Doyo

Tout sur Aménagement et terrasses

À dire à Doyo

  • Ce que vous voulez construire et où
  • Des mesures approximatives
  • Des photos de l’espace
  • Votre échéancier

Qui se présente

A pro who has passed Doyo’s ID and police record checks, with ratings from real jobs. See their profile, reviews and past work before you choose.

Mode de paiement

Un acompte à l’acceptation du devis, conservé par Doyo ; le solde à la fin des travaux ; une partie du paiement du pro est retenue pendant la période de garantie.

FAQ

Aménagement et terrasses à North York : questions fréquentes

Centre d’aide

Sur devis écrit. Un pro se déplace, examine les lieux et envoie un devis détaillé dans l’application. Vous versez un acompte à l’acceptation, et Doyo le conserve jusqu’à ce que vous confirmiez que le travail est terminé. Une partie du paiement du pro est retenue pendant une période de garantie après la fin des travaux : il reste donc de l’argent en jeu si quelque chose doit être repris.