Skip to content

منطقه یورک

پیمانکاران بازسازی در ریچموند هیل، انتاریو

Richmond Hill’s Building Division issues permits for finished basements, basement walkouts, decks and sunrooms, and any plumbing or HVAC alteration. A deck needs one if it is attached to the house, more than 600 mm (2 ft) above grade, or larger than 10 m² (108 sq ft). A shed of 10 m² or less with no plumbing does not. If the basement is part of it: Richmond Hill’s Backwater Valve Subsidy Program pays up to $1,500 toward a backwater valve in a single-family home, duplex or triplex. Get the building permit first, have a licensed plumber or drain contractor install it, make sure the downspouts are disconnected, and apply within six months. Funding is first come, first served. دویو بازسازی را در سراسر ریچموند هیل رزرو می‌کند: کار را بگویید، قیمت کامل را پیش از رزرو ببینید و فقط بعد از انجام کار پرداخت کنید.

پروژه‌ها

  • بازسازی آشپزخانهپیش‌فاکتور کتبی
  • بازسازی حمامپیش‌فاکتور کتبی
  • تکمیل زیرزمینپیش‌فاکتور کتبی

قیمت پس از بازدید تعیین می‌شود. بیعانه شما تا تأیید کار نزد Doyo می‌ماند.

محلی

بازسازی در ریچموند هیل: آنچه باید بدانید

درباره ریچموند هیل

مجوز ساختمان

Richmond Hill’s Building Division issues permits for finished basements, basement walkouts, decks and sunrooms, and any plumbing or HVAC alteration. A deck needs one if it is attached to the house, more than 600 mm (2 ft) above grade, or larger than 10 m² (108 sq ft). A shed of 10 m² or less with no plumbing does not.

منبع: City of Richmond Hill, building permit FAQs

یارانه جلوگیری از آب‌گرفتگی زیرزمین

Richmond Hill’s Backwater Valve Subsidy Program pays up to $1,500 toward a backwater valve in a single-family home, duplex or triplex. Get the building permit first, have a licensed plumber or drain contractor install it, make sure the downspouts are disconnected, and apply within six months. Funding is first come, first served.

منبع: City of Richmond Hill, backwater valve subsidy

منطقه میراثی

The Gormley Heritage Conservation District, set up in 2009, is Richmond Hill’s first. Work that affects a heritage property’s heritage features needs a heritage permit before it starts.

منبع: City of Richmond Hill, cultural heritage planning

خانه‌های این منطقه

Of Richmond Hill’s 69,315 occupied homes in the 2021 census, about 44% were built in 2001 or later and about 15% before 1981; 57% are single-detached houses. Most furnaces, panels and fixtures here are second-generation, not originals.

منبع: Statistics Canada, 2021 Census

محله‌هایی که پوشش می‌دهیم

Oak Ridges · Mill Pond · Bayview Hill · Jefferson · Richmond Hill Centre · Langstaff — و باقی ریچموند هیل.

چطور کار می‌کند

رزرو بازسازی در Doyo

همه چیز درباره بازسازی

چه چیزی به Doyo بگویید

  • اتاق و چیزی که می‌خواهید عوض شود
  • عکس و اندازه‌های تقریبی
  • زمان‌بندی شما
  • بازه بودجه، اگر دارید

چه کسی می‌آید

A pro who has passed Doyo’s ID and police record checks, with ratings from real jobs. See their profile, reviews and past work before you choose.

روش پرداخت

هنگام پذیرش پیش‌فاکتور بیعانه می‌پردازید که نزد Doyo می‌ماند؛ باقی مبلغ پس از پایان کار؛ و بخشی از دستمزد متخصص تا پایان دوره ضمانت نگه داشته می‌شود.

پرسش‌های متداول

بازسازی در ریچموند هیل: پرسش‌های رایج

مرکز راهنما

با پیش‌فاکتور کتبی. متخصص بازدید می‌کند، فضا را می‌بیند و در اپ پیش‌فاکتوری ردیف‌به‌ردیف می‌فرستد. با پذیرش آن بیعانه می‌پردازید و Doyo آن را تا تأیید پایان کار از سوی شما نگه می‌دارد. بخشی از دستمزد متخصص هم تا پایان دوره ضمانت نگه داشته می‌شود، تا اگر چیزی نیاز به اصلاح داشت پشتوانه‌ای باقی مانده باشد.