Skip to content

Región de Peel

Paisajismo, terrazas y vallados en Brampton, Ontario

Brampton’s Building Division needs a permit for a finished basement, a second unit, new or enlarged window and door openings, and any deck that is attached to the house or 0.6 m (2 ft) or more above the ground. A storage shed needs one at 15 m² or more, and a gazebo or other accessory building at 10 m² or more. Re-shingling, a fence (other than a pool fence) and swapping a forced-air furnace without changing the ductwork don’t. Brampton’s Tree Preservation By-law needs a permit to remove or injure a tree on private property that is 30 cm or more in diameter at 1.37 m above the ground. Trees within 2 m of an occupied building are exempt. Doyo reserva de paisajismo en todo Brampton: describe el trabajo, ve el precio completo antes de reservar y paga solo cuando esté hecho.

Proyectos

  • Diseño de jardinespresupuesto por escrito
  • Terrazas y patiospresupuesto por escrito
  • Cercaspresupuesto por escrito

Se presupuesta tras una visita. Doyo retiene su depósito hasta que confirme el trabajo.

Local

Jardines y terrazas en Brampton: lo que hay que saber

Sobre Brampton

Permisos de construcción

Brampton’s Building Division needs a permit for a finished basement, a second unit, new or enlarged window and door openings, and any deck that is attached to the house or 0.6 m (2 ft) or more above the ground. A storage shed needs one at 15 m² or more, and a gazebo or other accessory building at 10 m² or more. Re-shingling, a fence (other than a pool fence) and swapping a forced-air furnace without changing the ductwork don’t.

Fuente: City of Brampton, building permits for homeowners

Árboles

Brampton’s Tree Preservation By-law needs a permit to remove or injure a tree on private property that is 30 cm or more in diameter at 1.37 m above the ground. Trees within 2 m of an occupied building are exempt.

Fuente: City of Brampton, trees on private property

Distrito patrimonial

The Churchville Heritage Conservation District, set up in 1990 in the Credit River valley, is Brampton’s only heritage conservation district. Exterior changes there go through a Churchville heritage permit application.

Fuente: City of Brampton, Churchville Heritage Conservation District

Residuos de jardín

Peel Region collects Brampton’s yard waste from March into December — weekly in spring and fall, every other week in July, August and September. Use kraft paper bags or rigid containers labelled “yard waste” (up to 125 L), each under 20 kg; plastic bags and grass clippings aren’t taken.

Fuente: Peel Region, setting out yard waste

Barrios que cubrimos

Bramalea · Downtown Brampton · Springdale · Heart Lake · Castlemore · Fletcher’s Meadow · Mount Pleasant · Churchville — y el resto de Brampton.

Cómo funciona

Reservar Jardines y terrazas en Doyo

Todo sobre Jardines y terrazas

Qué contarle a Doyo

  • Qué quiere construir y dónde
  • Medidas aproximadas
  • Fotos del espacio
  • Sus plazos

Quién viene

A pro who has passed Doyo’s ID and police record checks, with ratings from real jobs. See their profile, reviews and past work before you choose.

Cómo pagas

Un depósito al aceptar el presupuesto, retenido por Doyo; el resto al terminar; una parte del pago del profesional se retiene durante el periodo de garantía.

Preguntas frecuentes

Jardines y terrazas en Brampton: preguntas frecuentes

Centro de ayuda

Con presupuesto por escrito. Un profesional visita, mira el espacio y envía un presupuesto detallado en la aplicación. Usted paga un depósito al aceptarlo y Doyo lo retiene hasta que confirme que el trabajo está terminado. Parte del pago del profesional se retiene durante un periodo de garantía tras la finalización, de modo que sigue habiendo dinero en juego si algo hay que corregir.